COMPLETED TASKS

2022:

N

Development of the Odolanów Gas Compression Station

Investor: OGP GAZ-SYSTEM S.A. 

N

Construction of DN1000 Goleniów-Lwówek gas pipeline together with the auxiliary infrastructure comprising: Part 2:  Stage II – gas pipeline Ciecierzyce – Lwówek

Investor: OGP GAZ-SYSTEM S.A. 

N

Construction of the interconnection gas pipeline constituting a combination of transmission systems of the Republic of Poland and the Republic of Lithuania together with the auxiliary infrastructure in the mazowieckie, podlaskie and warmińsko-mazurskie provinces, i.e. the Poland-Lithuania gas pipeline, northern section – PART 3 – ZZUP Kuków – Polish-Lithuanian border (47.440 km).

Investor: OGP GAZ-SYSTEM S.A.

 

2021:

 

N

Construction of the Gas Reduction and Measurement Station (SRP) in Brzeg – development of the design documentation (adjustment of the existing design of the station in Brzeg from the capacity of Q=2500 m3/h to the capacity of Q=5000 m3/h) and completion of the construction works

Investor: OGP GAZ-SYSTEM S.A.

N

Construction of Rembelszczyzna – Mory – Wola Karczewska gas pipeline – reconstruction of the existing Junction and Mory station together with the auxiliary infrastructure

Investor: OGP GAZ-SYSTEM S.A. 

N

Reconstruction of the DN500 MOP 5.5 MPa gas pipeline with the length of 550 m Tworzeń-Twaróg, section II in Dąbrowa Górnicza – completion of the construction works

Investor: OGP GAZ-SYSTEM S.A. 

N

Development of the design documentation and construction works for the task “SRP Gdyńska – replacement of leaky fittings”.

Investor: OGP GAZ-SYSTEM S.A. 

2020:

N

Construction of the high pressure gas pipeline DN1000 MOP 8,4 Mpa Zdzieszowice-Kędzierzyn along with the infrastructure necessary for its operation

Investor: OGP Gaz-System S.A.

N

Construction of the high pressure gas pipeline constituting a combination of transmission systems of the Republic of Poland and the Republic of Slovaktogether with the auxiliary infrastructure – Strachocina gas pipeline – Polish border

Investor: BUDIMEX S.A.

N

Development of the design documentation and construction works
for the dismantling old pipes for testing on Barlinek-Goleniów-Police gas pipeline DN 500

Investor: OGP Gaz-System S.A.

N

Repair of the high pressure gas pipeline DN250 Wałcz-Stargard

Investor: OGP Gaz-System S.A.

2019:

N

Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Grójec to Bielany: stage Ib-IV)

Investor: OGP Gaz-System S.A.

N

Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Grójec to Bielany: stage Ia)

Investor: OGP Gaz-System S.A.

2018:

N

Construction of the high pressure gas pipeline Lwówek-Odolanów along with the infrastructure necessary for its operation – stage II – gas pipeline Krobia-Odolanów

Investor: OGP GAZ-SYSTEM S.A.

N

Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Bielany to Kęty: stage I, II)

Investor: OGP Gaz-System S.A.

N

 Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Bielany to Kęty: stage Via, Vib)

Investor: OGP Gaz-System S.A.

N

Construction of the high pressure gas pipeline Lwówek-Odolanów DN 1000 MOP 8,4 Mpa, stage I – Lwówek-Krobia

Investor: PORR S.A.

N

Replacement of the DN1200 ball valve at the Szamotuły Gas Compression Station

Investor: System Gazociągów Tranzytowych EuRoPol GAZ S.A

N

Replacement of the DN900 and DN1200 ball valves at the Ciechanów Gas Compression Station

Investor: System Gazociągów Tranzytowych EuRoPol GAZ S.A.

2017:

N

Construction of the measuring station Q=125 tys. M3/h in Płock along with a connecting gas pipeline DN400, as part of the connection to the transmission network of Gaz-System S.A.

Investor: OGP Gaz-System S.A.

N

Construction of the high pressure gas pipeline DN 300 MOP 5,5 MPa Legnica-Polkowice-Żary along the infrastructure necessary for its operation within the territory of the Dolnośląskie and Lubuskie provinces at the section Polkowice-Żary substage Gaworzyce-Żary Lubuskie Province

Investor: OGP GAZ-SYSTEM S.A.

N

Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Bielany to Kęty: stage VII, VIII)

Investor: OGP Gaz-System S.A.

2016:

N

Connection to the industrial network of the equipment and gas system from two gas blocks located in EDF Power Plant Toruń S.A., located in Toruń, at Ceramiczna Street

INVESTOR: OGP GAZ-SYSTEM S.A

N

Construction of the h/p gas pipeline with the infrastructure in Toruń District within the investment “Construction of GT 50 gas blocks, at Ceramiczna Street in Toruń”

INVESTOR: EDF TORUŃ S.A.

N

Overhaul of the high pressure gas pipeline DN 500 MOP 5,0 MPa from Rembelszczyzna to Włocławek I including crossing of Kamieniczka river in the locality of Kamienica, Dobrzyń under Vistula district.

INVESTOR: OGP GAZ-SYSTEM

N

Overhaul of the gas pipeline from Oświęcim to Szopienice in Imielin – civil works  – stage I.

INVESTOR: OGP GAZ-SYSTEM

N

Construction of the membranę system for helium recovery at the stream of product gas through Kościan – Brońsko natural gas mines. Membrane system construction – stage II.

INVESTOR: PGNiG S.A.,  ORDERING PARTY: ATREM S.A.

N

Construction of the h/p gas pipeline DN 500 MOP 8.4 MPa, Gałów node – Kiełczów node within construction of the gas pipeline at the border of the Republic of Poland (Lasów) Taczalin – Radakowice – Gałów – Wierzchowice including the infrastructure necessary to support it on the grounds of the Lower Silesia region.

INVESTOR: OGP GAZ-SYSTEM S.A., ORDERERING PARTY: ZRUG ZABRZE S.A.

N

Development of the construction works in terms of repair Oświęcim-Kęty gas pipeline (the section from Bielany to Kęty: stage III, IV)

Investor: OGP Gaz-System S.A.

2015:

N

Construction of the high pressure gas pipeline DN 700, on the section of the node Lasów – Tłocznia Jeleniów within construction of the gas pipeline at the border of the Republic of Poland (Lasów) Taczalin – Radakowice – Gałów – Wierzchowice including the infrastructure necessary to support it on the grounds of the Lower Silesia region.

INVESTOR: OGP GAZ-SYSTEM S.A.

N

Construction of the h/p gas pipelines within the EU project: “Construction of the h/p gas network Szczytno- Młynowo-Mławki, near Kętrzyn and gasification of the municipalities. 
Part I – Construction of the h/p gas pipeline Młynowo-Mławka Part II-Construction of the h/p gas pipeline Szczytno-Rybno Stage II

INVESTOR:  PSG Sp. z o.o.

N

Construction of the h/p gas pipeline in Brodnica-Nowe Miasto Lubawskie-Iława.

INVESTOR:  PSG Sp. z o.o.